Skip to content
Engineering

Cable lines up to 400 kV

C&G, with its long experience and wide knowledge, has become one of the key companies for the supply and installation of cables and cable equipment for different voltage levels, construction requirements and the needs of network operators and users.

We have delivered and installed the equipment for demanding projects such as the 400/110 – 220/110 kV Cirkovce DTS with the transmission line unbundling, the 110 kV cable system on the 2×110 kV Bršljin DTS – Gotna vas DTS transmission line, the 110 kV connection line for the Bežigrad DTS, the 2×110 kV connection line for the 110/20 kV Vojnik DTS, and the 110 kV cable system for the Hrastnik DTS.

Reference projects

Complete solutions in the energy sector

Always looking to the future, to stay at the cutting edge of development, we create new solutions, new services and new paths to energy efficiency, reliable control, greater safety, efficiency, and careful management of resources. The C&G Group is committed to excellence that goes beyond the wishes of our clients and the expectations of the society: the future of energy, industrial and infrastructure projects is in the best hands with us. Planned strategic investments in research and development, confidence in our own knowledge and skills, and the promotion of innovation have produced results, among which the development of our GRIDPULSE system solution for real-time management and assessment of the condition of existing and new overhead lines.

Members of the C&G Group

C&G Ljubljana
Sipro inženiring
Elmont