Skip to content
Reference projects

Distribution transformer station DTS 400/110 – 220/110 kV Cirkovce with the transmission line unbundling – supply and installation of 110 kV cable systems

We supplied and installed the cable equipment (110 kV cable, 110 kV cable terminations for outdoor installation, 110 kV cable connectors, 110 kV surge arresters) for ELES.

Complete solutions in the energy sector

Always looking to the future, to stay at the cutting edge of development, we create new solutions, new services and new paths to energy efficiency, reliable control, greater safety, efficiency, and careful management of resources. The C&G Group is committed to excellence that goes beyond the wishes of our clients and the expectations of the society: the future of energy, industrial and infrastructure projects is in the best hands with us. Planned strategic investments in research and development, confidence in our own knowledge and skills, and the promotion of innovation have produced results, among which the development of our GRIDPULSE system solution for real-time management and assessment of the condition of existing and new overhead lines.

Members of the C&G Group

C&G Ljubljana
Sipro inženiring
Elmont
Gridpulse