We carried out the construction works, supplied and installed the cable equipment, and designed, supplied and installed the steel structure for ELES.
Supply and installation of equipment for the 2×110 kV connection line for 110/20 kV Vojnik DTS
![](https://c-g.si/wp-content/uploads/2023/07/RTP-vojnik2-1600x900.jpg)
![](https://c-g.si/wp-content/uploads/2023/07/RTP-vojnik4-1600x1030.jpg)
![](https://c-g.si/wp-content/uploads/2023/07/RTP-vojnik5-1600x1092.jpg)
![](https://c-g.si/wp-content/uploads/2023/07/RTP-vojnik1-979x1600.jpg)
![](https://c-g.si/wp-content/uploads/2023/07/RTP-vojnik3-1600x1200.jpg)
![](https://c-g.si/wp-content/uploads/2023/07/RTP-vojnik2-1600x900.jpg)
We carried out the construction works, supplied and installed the cable equipment, and designed, supplied and installed the steel structure for ELES.