We supplied the equipment, carried out the electrical installation works and commissioned the control system at the Vodice metering and regulating station for the investor.
Construction of the M2/1 transmission pipeline on the Trojane – Vodice section
![](https://c-g.si/wp-content/uploads/2023/07/Trojane-vodice3-1600x1200.jpg)
![](https://c-g.si/wp-content/uploads/2023/07/Trojane-vodice1-1600x1200.jpg)
![](https://c-g.si/wp-content/uploads/2023/07/Trojane-vodice2-1600x1200.jpg)
![](https://c-g.si/wp-content/uploads/2023/07/Trojane-vodice4-1600x1200.jpg)
![](https://c-g.si/wp-content/uploads/2023/07/Trojane-vodice5-1600x1199.jpg)