In addition to the electrical installation works, we participated in the construction of the transmission pipeline by installing a gas pipe, making the connection to the rest of the transmission pipeline system and constructing the accompanying facilities on the transmission pipeline.
The BELA metering and regulating station and LEVI BREG metering and regulating station
![](https://c-g.si/wp-content/uploads/2023/07/kp-ajdovscina2-1600x1200.jpg)