For the Ministry of the Environment and Spatial Planning, we supplied the equipment and carried out electrical installation works for the new substation at the Dekani ENP facility.
Modernisation of the existing railway line Divača – Koper, Phase II, Stage A
![](https://c-g.si/wp-content/uploads/2023/07/zelez-divaca-koper6.jpg)
![](https://c-g.si/wp-content/uploads/2023/07/zelez-divaca-koper1.jpg)
![](https://c-g.si/wp-content/uploads/2023/07/zelez-divaca-koper2.jpg)
![](https://c-g.si/wp-content/uploads/2023/07/zelez-divaca-koper3.jpg)
![](https://c-g.si/wp-content/uploads/2023/07/zelez-divaca-koper4.jpg)
![](https://c-g.si/wp-content/uploads/2023/07/zelez-divaca-koper5.jpg)