We carried out the construction works, the supply and installation of a 110 kV free-circuit switchgear and equipment for own use, and electrical installation works for Elektro Ljubljana.
Supply and installation of equipment and construction works at 110/20 kV Vodenska DTS
![](https://c-g.si/wp-content/uploads/2023/07/trb-vodenska5-1600x1066.jpg)
![](https://c-g.si/wp-content/uploads/2023/07/trb-vodenska1-1600x1066.jpg)
![](https://c-g.si/wp-content/uploads/2023/07/trb-vodenska2-1600x1066.jpg)
![](https://c-g.si/wp-content/uploads/2023/07/trb-vodenska3-1600x1066.jpg)
![](https://c-g.si/wp-content/uploads/2023/07/trb-vodenska4-1600x1066.jpg)